Thanks to our friends at the National Tramway Museum, 143 now has a pair of matching headlamps. These will be refurbished for use on 143 but it is proposed to fit some discreet halogen headlamps in addition to conform to Blackpool Transport's request. Meanwhile, the low voltage interior lighting and bells have been wired up, along with 2 x 12v batteries and a 24v isolator switch.
Wednesday, 21 April 2010
Spotlight on 143
Thanks to our friends at the National Tramway Museum, 143 now has a pair of matching headlamps. These will be refurbished for use on 143 but it is proposed to fit some discreet halogen headlamps in addition to conform to Blackpool Transport's request. Meanwhile, the low voltage interior lighting and bells have been wired up, along with 2 x 12v batteries and a 24v isolator switch.
Upper deck assembly starts
Wednesday, 31 March 2010
Reunited with top deck
Rapid progress has been made on trial fitting the upper deck of 143 just one week later than it arrived as a kit of parts from Gillett's of Wesham. On 31 March, the two decks were reunited allowing the internal partitions to be fabricated before the two decks are separated once more. It is then proposed that the lower deck will be moved to Blackpool Transport whilst the upper deck is completed.
Thursday, 25 March 2010
... and now in Red
Roof assembled! A significant milestone...
Wednesday, 24 March 2010
Upper deck meets lower deck!
Thursday, 4 March 2010
All wired up!
Subscribe to:
Posts (Atom)




